Photos
Areas 4, 5 and 6 and the second server rack from the front of the room.
Top of a rack showing patch panels, Asante hub, 3COM switches, and Cisco 2900 switches.
Bottom of a rack showing Cisco 7010
and 7000 routers.
Patch panel on the first server rack
showing connections (green) to all computers,
connection (red) to second server rack, and
connection (yellow) from the analyzer port to rack 1.